Interior Construction

Looking for reliable interior construction contractors in Dubai, Sharjah, or Across UAE? UAR Decor handles all interior build work – from partition walls to complete fit-outs. We’ve been building interiors in the UAE for over 8 years and know exactly what works in this climate.

Why We Are Your Interior Construction Specialists

We’re not just another interior construction company in Dubai making promises. Our team actually delivers what we commit to. We’ve seen too many projects where contractors disappeared halfway through or delivered poor quality work that needed expensive fixes.

The biggest problem with interior construction in the UAE? Many contractors don’t understand local building codes, use cheap materials that fail in the heat, or don’t coordinate properly with other trades. We’ve fixed jobs where walls were built in wrong places, electrical work didn’t meet Dubai Municipality standards, and air conditioning couldn’t handle the load because of poor planning.

Our approach is different. We plan every detail, use quality materials that last in Dubai’s climate, and coordinate all trades to avoid conflicts. Every project gets a dedicated site manager who lives on-site during construction.

Our Interior Construction Specialties

Partition Walls & Ceilings  

Drywall, steel stud, and glass partitions for offices and residential spaces. We handle everything from simple room dividers to complex acoustic separations.

Flooring Installation  

All types of flooring – marble, tiles, hardwood, vinyl, and carpet. We know which materials work best in different UAE locations and climates.

Electrical & Lighting Systems  

Complete electrical fit-outs including power distribution, lighting design, and smart home systems. All work meets Dubai Municipality standards.

Plumbing & Sanitary Work  

Bathroom fit-outs, kitchen plumbing, and utility connections. We handle everything from simple fixtures to complex central systems.

HVAC Integration  

Ductwork, ventilation systems, and air conditioning integration. We coordinate with MEP consultants to ensure proper climate control.

Fire Safety & MEP  

Fire alarm systems, emergency exits, and MEP coordination. We ensure all work meets Civil Defense requirements.

Custom Carpentry & Millwork  

Built-in storage, custom cabinetry, and architectural millwork. Our workshop produces high-quality pieces that fit perfectly.

Our Experience in UAE Interior Construction

We’ve completed over 800 interior construction projects across Dubai, Sharjah, and Across UAE. Our experience includes:

Residential Projects: Villa renovations in Palm Jumeirah, Jumeirah Islands, and apartment fit-outs in Marina, Business Bay

Commercial Projects: Office build-outs in DIFC, retail fit-outs in major malls, and restaurant construction across Dubai

Healthcare Projects: Medical clinic fit-outs with specialized requirements for hygiene and accessibility

Educational Projects: School renovations and training center construction with proper safety and acoustic considerations

Our team includes certified tradesmen, project managers, and safety coordinators. We’re ISO certified and maintain high standards for quality and safety on every project.

Common Interior Construction Problems We Fix

Poor Workmanship  

We’ve seen cracked walls, uneven floors, and poor finishes from other contractors. Our quality control prevents these issues and we fix them when we find them.

Code Violations  

Many contractors ignore Dubai Municipality requirements. We ensure all work meets local codes and passes inspections on first try.

Coordination Issues  

When electrical, plumbing, and HVAC aren’t coordinated, you get conflicts and delays. We plan everything in advance and manage all trades.

Material Quality  

Cheap materials fail quickly in Dubai’s climate. We use quality materials that last and

Seasonal Construction Challenges

Summer Heat Impact  

Dubai’s summer heat affects concrete curing, adhesive performance, and worker productivity. We adjust schedules and use appropriate materials for each season.

Humidity Issues  

High humidity can cause problems with paint, adhesives, and finishes. We use dehumidifiers and climate-appropriate materials.

Sandstorm Protection  

We protect work areas during sandstorms and plan critical phases to avoid weather delays.

Real Case Studies from Our Projects

Office Fit-Out in DIFC  

Challenge: A law firm needed to fit out 12,000 sq ft of shell space in 6 weeks. The project included complex millwork, high-end finishes, and integration with the building’s systems.

Our Solution: We created a detailed construction schedule with overlapping phases. Started MEP rough-in while finalizing millwork designs. Used prefabricated elements where possible and coordinated closely with building management.

Result: Completed the project in 5.5 weeks with zero punch list items. The client moved in on schedule and the quality exceeded their expectations. The building management praised our coordination and cleanliness.

Restaurant Construction in City Walk  

Challenge: A new restaurant needed complete interior construction including kitchen, dining areas, and specialized ventilation systems. The tight space required careful coordination between trades.

Our Solution: We created a 3D model showing all MEP systems to avoid conflicts. Built the kitchen first to ensure proper ventilation, then worked outward to dining areas. Used materials that meet restaurant hygiene standards.

Result: The restaurant opened on schedule and passed all health department inspections on first try. The efficient kitchen layout helps them serve customers faster. The owner said our coordination prevented costly delays.

Villa Renovation in Arabian Ranches  

Challenge: A family wanted to completely renovate their 5,000 sq ft villa while living in it. The work included moving walls, upgrading electrical systems, and adding new bathrooms.

Our Solution: We phased the work so the family could stay in one section while we renovated others. Created temporary utilities and maintained access to essential areas. Used dust barriers and worked quietly during family time.

Result: The renovation took 12 weeks as planned. The family was amazed they could live comfortably during construction. The final result transformed their home and the quality was excellent throughout.

Frequently Asked Questions

1. What's included in your interior construction service?

We handle all interior build work – walls, ceilings, flooring, basic electrical and plumbing, and millwork. MEP design and structural work require separate specialists.

Typical residential projects take 6-12 weeks. Commercial projects can take 12-20 weeks depending on complexity. We provide detailed schedules with each proposal.

Yes, we manage all permits with Dubai Municipality and coordinate inspections. This includes electrical, plumbing, and fire safety approvals.

Yes, we regularly work in occupied buildings. We use dust barriers, schedule noisy work appropriately, and maintain access to essential areas.

We follow Dubai Municipality standards, British Standards for materials, and our own quality control procedures. All work is inspected at key stages.

We provide detailed change order procedures and pricing. Small changes are included but major changes require written approval and schedule adjustments.

We provide 1-year warranty on all workmanship and pass through manufacturer warranties on materials. We also offer maintenance contracts.

Yes, we can work extended hours to meet deadlines. Weekend and evening work includes additional charges for overtime.

We have full-time safety coordinators, provide proper PPE, and follow UAE safety regulations. All workers are trained and certified.

Yes, we can usually match existing materials and finishes. We recommend bringing samples to ensure the best match possible.